Years, structure
Load-bearing structure and weathertightness of the external envelope.
Process
Seven stages with defined owners, lead times and deliverables. You always know which phase your project is in and what happens next.
Seven stages
These are the lead times we actually work to. The only one we do not control is municipal permitting.
A 30-minute call to understand the site, the layout, the available budget and the timeline. We come out of it with a shortlist of models and a realistic investment range.
We check the municipal plan and permitted use, agricultural, ecological, heritage and easement restrictions, slope, geotechnics, truck and crane access and available connections. You get a written report with identified risks. If the site does not work, we say so here.
Plans, elevations, sections, siting drawing, technical specification of materials and equipment, and a fixed-price quotation with itemised lines. Two rounds of revisions included.
Filing with the municipality: full permit, prior notification or preliminary information request as appropriate. Engineering design packages, consultation of external bodies where required, and follow-up until prior control is granted.
Structure, insulation, services, windows and finishes in a factory environment. Weekly photo report and one client visit to the production line included in the price.
Special transport with road permits, crane placement onto completed foundations, module joining, joint sealing and final water, drainage and electrical connections.
Final testing, technical dossier, energy certificate, occupancy application and registration. Handover with a user manual and a 10-year structural and 2-year equipment warranty.
Site
We turn projects down regularly, and that is why the ones we accept go well. A finished 40 foot module weighs 6 to 9 tonnes and has to reach the site on an articulated truck and be lifted by a crane with the right reach.

Warranties
Load-bearing structure and weathertightness of the external envelope.
Profiles, ironmongery and seals of external windows and doors.
HVAC, water heater, appliances and sanitaryware.
Interior linings, paintwork and joinery.
FAQ
Four to nine months from contract to keys, with permitting the dominant variable. Manufacturing and installation, the part we control, take between 26 and 114 days.
Yes, and we encourage it. One visit is included in the price, ideally at the stage where structure and insulation are visible but the walls have not closed — that is where the real quality of a module shows.
We do, with our in-house technical team and certified designers. The client signs as applicant and provides proof of ownership. Where viability is uncertain, we propose a preliminary information request first.
We work with third-party designs. We run a modular compatibility analysis and set out the adaptations needed for the drawing to be manufacturable as transportable modules. Sometimes that adaptation is minimal; sometimes it means rethinking the structural grid.
Tell us where the land is and which layout you are after. We reply within 48 hours with a detailed quotation, a lead time and a clear list of what is and is not included.